Loading... Please wait...

Sign Up for our Email!


Engineered Diesel

1999-2003 7.3L Powerstroke HEUI Injector (Long Lead)

  • Image 1
Price:
$265.00
SKU:
AP63804AE
Brand:
Weight:
5.00 LBS
Shipping:
Calculated at checkout
Quantity:


Product Description

 *Image is a representation of this item. Actual item may vary.

1999-2003 7.3L Powerstroke HEUI Injector (Long Lead)

 

Prime (Split Shot) Injector. Long lead, used in cylinder #8 to prevent crackle.

 

Core Policy

REQUIRED: You must choose to either pay your core charge at the time of purchase or waive your core charge and mail us your cores first. 

 Core charge will be refunded if core is returned within 30 days of purchase.

 

If you have chosen to waive the core charge, mail them to the following address 

 

Attn: Cores 

Engineered Diesel 

8566 Lake Michigan Dr 

Allendale, Mi 49401 

Your product wil be shipped to you after we receive your cores.

 

IMPORTANT!

Drain as much fluid as possible. Package your core so as to prevent puncture of packaging.

Engineered Diesel, UPS, Fed Ex, and the US Postal Service will NOT tolerate fluid contamination of other packages.

*THE SENDER WILL BE LIABLE FOR DAMAGES, FREIGHT, AND/OR LOST CORE DEPOSITS CAUSED BY IMPROPER PACKAGING*

 

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!

Add to Wish List

Click the button below to add the 1999-2003 7.3L Powerstroke HEUI Injector (Long Lead) to your wish list.

You Recently Viewed...